Client: ISTAC (ISTANBUL CEVRE YONETIMI SANAYI VE TIC. A.S.)

Project Name: CONSTRUCTION and OPERATION OF INDUSTRIAL WASTE THERMAL DISPOSAL PLANT (BOT Project)

Construction & Commissioning Period : 3 years

Area: 10 Ha

Waste amount: min. 33.000 ton/year (~ 100 t/d)

Types of wastes: Combustible plastic wastes, used oils, pharmaceutical and cosmetic wastes, medical waste, petrochemical waste, PVC, solvent, paint, glues, treatment plant sludges etc.

Explosive and radioactive materials shall not be accepted.

Types of feeding systems: Bunker feed, vessel feed, liquid feed and particular liquid feed.

Main units of the plant: Temporary storage area, rotary kiln incinerator, cogeneration unit (optional), waste gas treatment and emission monitoring, wastewater treatment, ash and cinder collection.

Other details:

  • Temperature in 1st incineration room shall be 800 – 900oC and 1000 - 1200 oC in 2nd incineration room.
  • Contact time in incineration process shall be taken as minimum 2,50 sec.